🛣

Game phase

Development phase roadmap
  1. 1.
    Dapp roadmap: The first week (10/15-10/21),
  2. 2.
    Game roadmap:
The first week [10/15-10/21]
● Public chain docking
  • Access by login
  • Token recharge game currency
  • Withdraw modern coins from game coins
  • Chain game database design.
The second week [10/22-10/27]
● Game content adaptation chain economic system
  • In-game leaderboard adaptation chain
  • Adaptation to the in-game consignment
  • Access to game on-hook mining mechanism
  • Development of other games on the chain
The third week [10/28-11/03)
● Localization of the main game system
  • English localization
  • Chinese localization
Week 4 [11/04-11/09]
● Three-terminal packaging
  • Android installation package
  • Apple installation package
  • Win system package
  • Mac system package
● Hot update service construction
  • Android installation package
  • Apple installation package
The fifth week [11/10-11/16]
● Complete test of the game
● BUG repair
● External network deployment, small-scale external testing